Skip to calculator
Fieldlink NZ
FIELDLINKNZ
Start 30-day free trial

Free civil tool · Metric · No signup

Pipe Bedding Calculator

Bedding and surround aggregate for a pipe run — m³ and tonnes at the density you enter.

Example inputs are editable. Use your project values. Enter 0 where no optional allowance is intended; blank fields pause the calculation.

Your inputs

Your results

Bedding
6.48 m³
Pipe surround (less pipe displacement)
16.05 m³
Total aggregate
22.53 m³
Estimated tonnes (no allowance)
33.79 t

These free results do not automatically save or sync to a Fieldlink job.

How it works

  • Bedding = L × W × bedding depth
  • Surround = L × W × (OD + surround) − pipe displacement
  • Pipe displacement = π × (OD/2)² × L
  • Tonnes = total m³ × density

Worked example

48 m × 0.9 m trench, 300 OD, 150 bedding + 150 surround Bedding 6.48 m³ + surround 16.05 m³ = 22.53 m³ → 33.8 t @ 1.5 t/m³

Assumptions and practical notes

Zero cover still includes aggregate beside the pipe up to its crown; choose Bedding only to exclude that zone. Use a density matching the measured volume basis and specified material. Confirm the conversion with your supplier; loose delivered volume and compacted installed volume are not interchangeable.

Working on the full job?

Include the specified bedding and surround in your drainage estimate.

Explore drainage estimating